View looking northwest from top of gantry crane number 6 between shipways 5 and 6. Shipways 1, 2, 3, 4, and 5, with hulls 6, 5, 4, 3, and 2 from right to left, in center. Stiff leg derrick and revolving gantry crane along outfitting pier in center...
View looking North from top of Gantry Crane on number 6 craneway at inboard end of shipbuilding ways 5 and 6. Hulls 3, 4, 5, and 6, from left to right, on ways 4, 3, 2, and 1, respectively. Clyde Gantry Cranes and Derrick & Hoist Gantry Cranes in...
View looking due North from top of Gantry Crane on runway number 6 between shipways 5 and 6. Hulls 3, 4, 5, and 6 from left to right on shipways 4, 3, 2, and 1 across background of picture. Assembly work in progress on new welding slabs in...
View looking West from top of Gantry Crane on runway number 6 between shipways 5 and 6. Hulls number 1, 2, and 3 on shipways 6, 5, and 4 from left to right. Electric substation number 7 at right foreground. Maritime Office Building and new Plate...
View looking North from top of Gantry Crane on Craneway number 6 between shipways number 5 and number 6. Hulls 2, 3, 4, 5, and 6 shown from left to right, on ways 5, 4, 3, 2, and 1, respectively. The equipment in left foreground are Constant...
View looking West from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Hulls 1 and 2 shown from left to right, on shipways 6 and 5. Fabricated items along craneway in center of picture. Substation number 7 at right...
View looking due North from Gantry Crane on craneway 6 between shipways 5 and 6. Hulls 2, 3, 4, and 5, from left to right, on ways 4, 3, 2, and 1 respectively. Clyde Gantry Cranes and Derrick & Hoist Gantry Cranes in operation in center of picture....
View looking due West from Gantry Crane on craneway 6 between shipways 5 and 6. Hulls 1, 2, and 3 on shipways 6, 5, and 4, from left to right. Hulls number 1 and number 2 rapidly approaching completion. Substation number 7 and proposed extension...
View looking Northeast from Gantry Crane on craneway 6 between shipways 5 and 6. General view of original and additional welding slabs along shipways 1 through 4. Main Shops Building at right with the Outfitting Slip beyond. Receiving Building and...
View looking east from Observation Platform near center of yard. Open type welding slab on way number 5 in center, with innerbottom sections being assembled. Closed type of welding platform on way number 4 at left, with burning operations in...
View of segregated intake to Shuttle Train, which transported workers from shipyard to downtown Houston. Two turnstiles in foreground. Turnstiles may be swiveled for payment at either entrance or exit from platform. New watch-tower in parking lot...
View of segregated entrance to Houston Shuttle Train. Four turnstiles on turn-tables for reversing at right center. Change booth and token booth at left.