View looking east from Observation Platform near center of yard. Open type welding slab on way number 5 in center, with innerbottom sections being assembled. Closed type of welding platform on way number 4 at left, with burning operations in...
View looking northeast from Observation Platform near center of yard. Ship work on welding slabs in center and foreground. Receiving Building and Issue Building in left background. Ship Channel and bulkhead wall of Outfitting Pier in center...
Looking to North from top of Gantry Crane on crane runway number 7. Ship ways numbers 1, 2, 3, 4, 5, and 6 in center of picture from right to left. Hulls 6, 5, 4, 3, 2, and 1 in same direction on these ways. Derrick & Hoist Gantry Crane in...
View looking northwest from top of gantry crane number 6 between shipways 5 and 6. Shipways 1, 2, 3, 4, and 5, with hulls 6, 5, 4, 3, and 2 from right to left, in center. Stiff leg derrick and revolving gantry crane along outfitting pier in center...
View looking due south from point between original facilities and additional facilities. Hull number 26 being erected on shipway number 7 at left of picture. Shipways number 8 and number 9 in center and right of picture. American Gantry Crane being...
View looking due North from top of Gantry Crane on runway number 6 between shipways 5 and 6. Hulls 3, 4, 5, and 6 from left to right on shipways 4, 3, 2, and 1 across background of picture. Assembly work in progress on new welding slabs in...
View looking West from top of Gantry Crane on runway number 6 between shipways 5 and 6. Hulls number 1, 2, and 3 on shipways 6, 5, and 4 from left to right. Electric substation number 7 at right foreground. Maritime Office Building and new Plate...
View looking West from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Hulls 1 and 2 shown from left to right, on shipways 6 and 5. Fabricated items along craneway in center of picture. Substation number 7 at right...
View looking Southeast from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Additional Welding Slab at shipway number 6 in foreground with bulkhead assembly in progress. Fire station and Garage Building in center...
View looking due North from Gantry Crane on craneway 6 between shipways 5 and 6. Hulls 2, 3, 4, and 5, from left to right, on ways 4, 3, 2, and 1 respectively. Clyde Gantry Cranes and Derrick & Hoist Gantry Cranes in operation in center of picture....
View looking due West from Gantry Crane on craneway 6 between shipways 5 and 6. Hulls 1, 2, and 3 on shipways 6, 5, and 4, from left to right. Hulls number 1 and number 2 rapidly approaching completion. Substation number 7 and proposed extension...
View looking Southeast from Gantry Crane on craneway 6 between shipways 5 and 6. Present Garage in foreground. Building will be reconditioned as tool room in the immediate future. Main Shops Building with Mold Loft overhead, at left of picture....
View looking Northeast from Gantry Crane on craneway 6 between shipways 5 and 6. General view of original and additional welding slabs along shipways 1 through 4. Main Shops Building at right with the Outfitting Slip beyond. Receiving Building and...