Interior view of Main Warehouse looking north from the south car well. All siding and roof decking in place. Last section of floor slab to be poured shown at extreme left. Railroad not complete in south car well.
Sports ; Stadiums ; Construction ; Stadium construction ; Aerial phtographs
Aerial photograph of Houston Astrodome, during construction. Steel framework in place; First portion of translucent roof being put into place. Two industrial cranes on ground.
Synagogues ; Religious institutions ; Architecture--Designs and plans
Plans for Synagogue Center for Congregation Am Echad in Auburn, Maine. Includes: Location plan. No scale. -- Roof plan. Scale is 1 inch to 20 feet. -- Site plan. Scale is 1 inch to 50 feet.
Taylor, Marvin, 1925-.;
Community activists -- Texas -- Houston -- Interviews;
Houston (Tex.) -- Race relations;
Houston (Tex.) -- History -- Anecdotes;
Herman Park (Houston, Tex.);
Oral histories
Marvin Taylor, a long time resident of Houston, talks about his involvement in the establishment of a jogging trail and improvements to Hermann Park, Houston.
Model T Ford 1/2-ton delivery truck. Open cab with half of windshield folded down. Three foot-control pedals can be seen in front of driver's seat. Emergency brake handle beneath steering wheel. Roof over entire truck, but cab is not enclosed.
Universities and colleges ; Architecture--Designs and plans ; University of Houston
Longitudinal section at the center of the Ezekiel W. Cullen Building at the University of Houston. Scale of plan is 1/8 inch to 1 foot. Includes: Methods of Fireproofing beams and durlins at 5th and attic floor roof of tower and 3rd floor roof,...