View looking North from top of Gantry Crane on number 6 craneway at inboard end of shipbuilding ways 5 and 6. Hulls 3, 4, 5, and 6, from left to right, on ways 4, 3, 2, and 1, respectively. Clyde Gantry Cranes and Derrick & Hoist Gantry Cranes in...
View looking Northeast from Gantry Crane on craneway 6 between shipways 5 and 6. General view of original and additional welding slabs along shipways 1 through 4. Main Shops Building at right with the Outfitting Slip beyond. Receiving Building and...
View looking northeast from Observation Platform near center of yard. Ship work on welding slabs in center and foreground. Receiving Building and Issue Building in left background. Ship Channel and bulkhead wall of Outfitting Pier in center...
View looking northwest from top of gantry crane number 6 between shipways 5 and 6. Shipways 1, 2, 3, 4, and 5, with hulls 6, 5, 4, 3, and 2 from right to left, in center. Stiff leg derrick and revolving gantry crane along outfitting pier in center...
View looking Southeast from Gantry Crane on craneway 6 between shipways 5 and 6. Present Garage in foreground. Building will be reconditioned as tool room in the immediate future. Main Shops Building with Mold Loft overhead, at left of picture....
View looking Southeast from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Additional Welding Slab at shipway number 6 in foreground with bulkhead assembly in progress. Fire station and Garage Building in center...
View looking West from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Hulls 1 and 2 shown from left to right, on shipways 6 and 5. Fabricated items along craneway in center of picture. Substation number 7 at right...
View looking West from top of Gantry Crane on runway number 6 between shipways 5 and 6. Hulls number 1, 2, and 3 on shipways 6, 5, and 4 from left to right. Electric substation number 7 at right foreground. Maritime Office Building and new Plate...
View of Air Compressor Station looking west from east side. All four units in full operation. Part of structural steel for building in foreground. Natural gas regulator for fuel to compressors at left foreground. Ship in background is on...
View of Main Warehouse looking southwest from northwest corner of building. Framework and buss work on Main 12 kv Substation in progress in foreground Pole at extreme right being set for temporary power line. Roadway and side ditches incomplete.
View of present Clock Alley with all additions from inside of Yard. Second floor at right used by Timekeepers and Time Checkers. New Clock Alley at left adjacent to Personnel Building in service. Sidewalks and restoring of grade in foreground.
View of scaffold tower and frame wreckage at forward end of way number 4. Showing damage from hurricane of July 27, 1943, referred to as the Surprise Hurricane
View of Scanlan Building with automobiles and streetcar in busy downtown Houston. Many shops on the first floor of the building and some people are walking on the streets.
View of segregated entrance to Houston Shuttle Train. Four turnstiles on turn-tables for reversing at right center. Change booth and token booth at left.
View of segregated intake to Shuttle Train, which transported workers from shipyard to downtown Houston. Two turnstiles in foreground. Turnstiles may be swiveled for payment at either entrance or exit from platform. New watch-tower in parking lot...