Subtitle: Containing the present state, county and city governments; a complete list of all county officials, post offices and money order offices in Texas; also, an index of societies, associations, churches, corporations, educational institutes;...
View taken from top of water tower looking southwest. Main parking lot in background with new Access Road beyond. Transportation Building recently constructed at extreme left edge of picture near large horizontal oil tank. Main Gate for entrance...
View of segregated intake to Shuttle Train, which transported workers from shipyard to downtown Houston. Two turnstiles in foreground. Turnstiles may be swiveled for payment at either entrance or exit from platform. New watch-tower in parking lot...
View of segregated entrance to Houston Shuttle Train. Four turnstiles on turn-tables for reversing at right center. Change booth and token booth at left.
View of scaffold tower and frame wreckage at forward end of way number 4. Showing damage from hurricane of July 27, 1943, referred to as the Surprise Hurricane
View of present Clock Alley with all additions from inside of Yard. Second floor at right used by Timekeepers and Time Checkers. New Clock Alley at left adjacent to Personnel Building in service. Sidewalks and restoring of grade in foreground.
View of Main Warehouse looking southwest from northwest corner of building. Framework and buss work on Main 12 kv Substation in progress in foreground Pole at extreme right being set for temporary power line. Roadway and side ditches incomplete.
View of Air Compressor Station looking west from east side. All four units in full operation. Part of structural steel for building in foreground. Natural gas regulator for fuel to compressors at left foreground. Ship in background is on...
View looking West from top of Gantry Crane on runway number 6 between shipways 5 and 6. Hulls number 1, 2, and 3 on shipways 6, 5, and 4 from left to right. Electric substation number 7 at right foreground. Maritime Office Building and new Plate...
View looking West from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Hulls 1 and 2 shown from left to right, on shipways 6 and 5. Fabricated items along craneway in center of picture. Substation number 7 at right...
View looking Southeast from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Additional Welding Slab at shipway number 6 in foreground with bulkhead assembly in progress. Fire station and Garage Building in center...