View taken from top of water tower looking southwest. Main parking lot in background with new Access Road beyond. Transportation Building recently constructed at extreme left edge of picture near large horizontal oil tank. Main Gate for entrance...
View of Main Warehouse looking southwest from northwest corner of building. Framework and buss work on Main 12 kv Substation in progress in foreground Pole at extreme right being set for temporary power line. Roadway and side ditches incomplete.
View of Air Compressor Station looking west from east side. All four units in full operation. Part of structural steel for building in foreground. Natural gas regulator for fuel to compressors at left foreground. Ship in background is on...
View looking West from top of Gantry Crane on runway number 6 between shipways 5 and 6. Hulls number 1, 2, and 3 on shipways 6, 5, and 4 from left to right. Electric substation number 7 at right foreground. Maritime Office Building and new Plate...
View looking West from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Hulls 1 and 2 shown from left to right, on shipways 6 and 5. Fabricated items along craneway in center of picture. Substation number 7 at right...
View looking Southeast from top of Gantry Crane on craneway number 6 between shipways number 5 and number 6. Additional Welding Slab at shipway number 6 in foreground with bulkhead assembly in progress. Fire station and Garage Building in center...
View looking Southeast from Gantry Crane on craneway 6 between shipways 5 and 6. Present Garage in foreground. Building will be reconditioned as tool room in the immediate future. Main Shops Building with Mold Loft overhead, at left of picture....
View looking Northeast from Gantry Crane on craneway 6 between shipways 5 and 6. General view of original and additional welding slabs along shipways 1 through 4. Main Shops Building at right with the Outfitting Slip beyond. Receiving Building and...
View looking North from top of Gantry Crane on number 6 craneway at inboard end of shipbuilding ways 5 and 6. Hulls 3, 4, 5, and 6, from left to right, on ways 4, 3, 2, and 1, respectively. Clyde Gantry Cranes and Derrick & Hoist Gantry Cranes in...
View looking North from top of Gantry Crane on Craneway number 6 between shipways number 5 and number 6. Hulls 2, 3, 4, 5, and 6 shown from left to right, on ways 5, 4, 3, 2, and 1, respectively. The equipment in left foreground are Constant...
View looking due West from Gantry Crane on craneway 6 between shipways 5 and 6. Hulls 1, 2, and 3 on shipways 6, 5, and 4, from left to right. Hulls number 1 and number 2 rapidly approaching completion. Substation number 7 and proposed extension...
View looking due North from top of Gantry Crane on runway number 6 between shipways 5 and 6. Hulls 3, 4, 5, and 6 from left to right on shipways 4, 3, 2, and 1 across background of picture. Assembly work in progress on new welding slabs in...
View looking due North from Gantry Crane on craneway 6 between shipways 5 and 6. Hulls 2, 3, 4, and 5, from left to right, on ways 4, 3, 2, and 1 respectively. Clyde Gantry Cranes and Derrick & Hoist Gantry Cranes in operation in center of picture....
Three drafts of a description of the history and business of House Plantation, a plantation owned by Arcola Sugar Mills Company. Sources include Bill Griffin, who lived on the plantation for 61 years and W. L. Howse, a former manager of the Arcola...